Archive

Good new in tender for upgrade at Thornton Arena

April 4, 2013   ·   0 Comments

An upgrade to the refrigeration system used to make artificial ice at the Thornton arena has come considerably under budget.

Essa township had budgeted $350,000 for the second phase of the upgrade at the arena which will see the replacement and increase in the capacity of the refrigeration equipment at the arena.

A review of tenders saw Industrial Refrigeration Systems bring in a bid of $282,165.52 including GST for the project.

Industrial also will be providing equipment which has a higher capacity than was required in the tender documents.

The contract was  prepared by and the bids reviewed  by Ainley Group.

Industrial of Milton has done maintenance work and a previous contract with the township.

By Richard Blanchard

 


Readers Comments (0)


You must be logged in to post a comment.

Page Reader Press Enter to Read Page Content Out Loud Press Enter to Pause or Restart Reading Page Content Out Loud Press Enter to Stop Reading Page Content Out Loud Screen Reader Support